Vetch’s Pier – a relic of floored planning

With recent developments regarding the proposed Durban dug-out port, a colleague of mine shared this gem of an article.

Vetch’s pier (Durban, South Africa) has redeemed itself by becoming a marine sanctuary. Historically, however, it is an expensive relic, a monument to flawed planning, poor workmanship and economic frustration.

Although potentially a major seaport, Durban’s bay was little more than an inaccessible lagoon before dredging and the construction of the north and south piers over a century ago unlocked its real worth. Nature guarded its entrance in the form of shifting sandbanks which made access to the safety of the inner harbor unpredictable and hazardous. As a result entry was restricted to small vessels drawing less than three metres of water. All other shipping had to anchor offshore and endure the extremes of wind and sea. Not surprisingly 66 ships were blown ashore on Durban’s beachfront between 1845 and 1885.

It was obvious from the outset to the British settlers that Natal’s economic prospects depended on the development of Durban harbour. For almost 50 years from 1850 the ‘harbour issue’ was the hardy annual of Natal politics and the correspondence columns of newspapers. Various plans were put forward, that of Captain James Vetch gaining the approval of Governor John Scott in 1857. Vetch, an engineer attached to the Admiralty in London, never actually visited Durban, yet he produced a report and plan to improve the harbour. Despite misgivings, it was rushed through the Natal legislature in October 1859 along with its hefty price tag -£165,000.

Vetch’s solution was to enclose the natural entrance to the harbour by means of two breakwaters, one curving northwards from the base of the Bluff headland and the other curving southwards from present day Ushaka beach. Besides the engineering challenge which that posed, Vetch’s plan ignored the prevailing wind an ocean current directions. But in August 1861 when construction of the northern breakwater commenced, such concerns were lost amidst the optimism of a growing economy and the belief that Vetch’s plan would resolve the frustrations of navigating the entrance to the harbour. A comment in the Natal Mercury on 13 July 1861 summed up the buoyant mood of colonists when it stated that Vetch’s plan would herald ‘new circumstances and be the scene of a busy, all pervading and prosperous industry.

The site engineer, George Abernethy, encountered difficulties with Vetch’s plan from the outset. The method of construction was impractical: sections of wooden framework filled with rubble simply collapsed in the surf, moreover, the contractor, Thomas Jackson, lacked the capacity to carry out the construction. Early in 1863 it was apparent that the six year project was stalled. Yet £90,000 of the budgeted £165,000 had been spent while less than ten percent of the work had been completed. Financial reasons and poor construction methods saw  Vetch’s pier abandoned in 1864. In time the ocean reduced it to what it is today. Both in design and placement, the small craft harbour now being proposed ignores the same natural forces that made Vetch’s plan impractical. Besides, it specifically ignores the pounding effects of the cyclone swells which emanate occasionally from the Mozambique channel.

In May 1864 a furious Natal Legislative Council demanded a detailed report on the Vetch project. In June the contractor walked off the job and left Natal. The Report tabled in August proved an embarrassing indictment. It found that no oversight had been exercised by Treasury officials on certificates for amounts payable and that the contractor had received payments in excess to that which he was entitled. It was also noted that freight for some materials had been paid for twice; that material had been ordered which was in excess of actual needs. To top it all, £113,500 or 70 percent of the allocated budget, had been spent on a project that was scarcely 20 percent complete and the problem of accessing Durban harbour was no closer to resolution.

Far from invigorating Natal’s economy, the submerged finger of an incomplete pier named after its designer, Captain Vetch, proved a drain on the colonial treasury for years to come, interest on the loan for the project amounting to about 17 percent of total revenue. A project born out of economic frustration left a legacy of even greater economic frustration. Until the 1880s Durban harbour languished having gained a reputation as a port of high charges and long delays. But from 1886 when dredging operations began, followed by extension of the breakwaters, the depth of the entrance channel improved. By 1892 it averaged over four metres allowing larger ships to cross the bar.

But the way forward was dogged by controversy. Two camps developed: one which saw the solution in dredging, the other in the extension of the north pier. So great was the agitation that it led to the fall of the government of Harry Escombe in October 1897. Ultimately, a combination of the scour facilitated by the north and south piers and the effects of dredging resolved access to Durban harbour. In 1904, the Armadale Castle, drawing 6,7 metres of water, became the first mail-steamer to enter the port.

Although incomplete and a non-starter, the remains of Vetch’s pier should serve as a reminder of the power of the ocean and the need for fearless scrutiny of public projects. Source: Duncan Du Bois (Ward Councillor) and Facts About Durban

New Durban dug-out Port – tenders released

State-owned freight logistics group Transnet has followed up its recent R1.8-billion purchase of the old Durban International Airport site, in KwaZulu-Natal, with the release of a number of separate tenders in support of its proposal to develop, in phases, a new dig-out port on the property.

The first phase, which was currently scheduled for completion in 2019, was expected to require an initial investment of R50-billion, with the balance of the project to be completed by 2037.

The first request for proposals (RFP) relates to the appointment of a transaction adviser for the project. The adviser will provide technical assistance relating to the establishment of a business model for the development of the harbour.

Transnet currently envisages a phased development of a facility comprising 16 container berths, five automotive berths and four liquid bulk berths. Its high-level infrastructure plan indicated that the container terminals would have the collective capacity to handle 9.6-million twenty-foot equivalent units, or TEUs, once all four phases were completed. That, the group argued, would be sufficient to address South Africa’s container capacity requirements to 2040.

The transaction adviser would be expected to complement and supplement the work, resources and expertise that Transnet had dedicated to the project internally. The consultant was expected to cover the legal, financial, environmental, economic and technical aspects of the proposed development. In order to facilitate the opportunity for financial planning and policy engagement, it is necessary to complete the assignment within an 18-month period.

The second RFP invites consultants to conduct conceptual and prefeasibility studies for the development . Transnet will employ a four-stage project lifecycle process for its capital expansion projects, with the two front-end loading (FEL) studies making up the first two stages. FEL implies upfront planning and engineering in order to reduce, as much as possible, the risk of scope creep and to ensure financial accuracy for the project. The FEL-1, or conceptual study, is scheduled to be completed by the end of March 2013, while the FEL-2 study should be finalised by the end of March 2014. Source: Creamer Media

EU ‘green tax’ will hit South African exporters

At the expense of coming across a bit cynical – what exactly is the aim of the ‘carbon emission’ movement? We know it’s a United Nations initiative; that many politicians, ex presidents, scientists and climatologists warn against the use traditional energy sources and preach of cataclysmic consequences if we do not need heed their call; that it has become the latest excuse for more government imposed taxes; that the very mention of CO2 conjours up animosity between the rich and poor nations in much the same way as the mention of the WTO. Lets not forget there’s even a ‘Green Customs Initiative’ just so that we can all feel mutually inclusive.

An article just published by IFW-net.com suggests that exporting from South Africa could become even more expensive if the country’s free-trade deal with the European Union (EU) is brought to an end and replaced by a shipping tax next year. The current trade deal removes tariffs on 98% of South Africa’s exported goods. Trade between the two regions creates around R400 billion (US$48bn) a year. Seems like taxation is the West’s latest answer to the failing WTO overtures on free trade!

At the United Nations conference on climate change in Durban, the EC will announce plans to tackle emissions. The proposed shipping tax, aimed at lowering carbon emissions, is expected to dramatically increase the cost of imports into the EU.

The EU’s envoy to South Africa, said shipping and aviation was a main contributor to carbon emissions.“That is why we are quite persistent that a shipping and aviation tax must be included in any deal that hopes to limit carbon emissions.” he said.

The EU has also sparked controversy over its plan for Emissions Trading Scheme that will apply to all airlines flying through its airspace from 1 January 2012.

One way or the other, SARS gets the monopoly on collecting the tax, regardless of its form.

For an alternative view on ‘green stuff’ read “The Recession Hits the Green Movement“. It’s perhaps a lot closer to the truth than all the ‘saving-the-planet’ stuff being dished up by the mainstream media.