Transnet Freight Rail to provide VGM Service for customers

June 1, 2016 — Leave a comment

Transnet Freight RailAs from 1 July 2016, Transnet Freight Rail (TFR), as a transporter, must obtain proof of sea export container weights for rail to a Transnet Port Terminals (TPT) port facility. TPT has already engaged with all its shipping line customers and all respective bodies. Customers working on average mass will not be allowed to do so as from 1 July 2016 and must provide verified proof of the mass loaded into a container.

After reviewing the requirements of SOLAS, TFR has come to the conclusion that it is able to offer the service to provide the Verified Gross Mass (VGM) for Method 1 to customers who make use of Transnet rail services for export containers railed from TFR terminals equipped with weighbridges – click here to read TFR’s requirements for VGM.

The following links provide examples of the documentation and declaration which must be made available to TFR either as part of the documentation or as a separate attachment –

Source: Transnet Freight Rail

Advertisements

No Comments

Be the first to start the conversation!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s